Integrated planning of material procurement and leveling of project resources by considering multiple criteria in the selection of suppliers

Integrated planning of material procurement and leveling of project resources by considering multiple criteria in the selection of suppliers


Integrated planning of material procurement and leveling of project resources by considering multiple criteria in the selection of suppliers

نوع: Type: seminar

مقطع: Segment: masters

عنوان: Title: Integrated planning of material procurement and leveling of project resources by considering multiple criteria in the selection of suppliers

ارائه دهنده: Provider: narges gazery

اساتید راهنما: Supervisors: دکتر امیرسامان خیرخواه

اساتید مشاور: Advisory Professors:

اساتید ممتحن یا داور: Examining professors or referees:

زمان و تاریخ ارائه: Time and date of presentation: 12|11|1399

مکان ارائه: Place of presentation: http://vc.basu.ac.ir/basu380624

چکیده: Abstract: برای زمانبندی پروژه و برنامه ریزی مواد، دو رویکرد متفاوت در ادبیات ذکر شده است؛ رویکرد متوالی و رویکردیکپارچه. رویکرد متوالی، شامل سه برنامه مستقل است که عبارتند از: برنامه زمان بندی فعالیت ها، برنامه مواد مورد نیاز و برنامه سفارش مواد. خروجی اصلی برنامه زمانبندی فعالیت ها، زمان اجرای فعالیت های پروژه است. بر اساس مقدار مواد مورد نیاز برای هر فعالیت، برنامه مواد مورد نیاز، مقدار مورد نیاز از هر ماده را در طول عمر پروژه محاسبه می کند. با توجه به نیازمندی های هر ماده، برنامه سفارشات، اندازه و زمان های مناسب برای سفارش هر ماده را مشخص. در رویکرد یکپارچه، سه برنامه فوق در یک مدل تصمیم گیری ادغام می شود. از این رو ما در این پژوهش سعی داریم که با در نظر گرفتن تامین کننده های متفاوت یک روش یکپارچه در این خصوص ارائه دهیم.